Specifier-ready. Schedule-safe. Finish-ready.
Hanging, taping, finishing, and texture for Phoenix GCs on multi-family, tenant improvement, and new construction projects. Steel stud framing, fire-rated board, ceiling grid — coordinated to your drawings so the crew shows up ready.
Spec home divisions and TI projects move fast — until the drywall sub shows up without the right gauge, wrong board type, or a crew that doesn't know the drawings. Then you're rewriting the schedule while your finish deadline gets pushed.
You need a commercial drywall sub who reads the specs, brings the right material to the site, and shows up when the phase is ready — not before. Speed and coordination, every time.
Standard gauge when the spec calls for 25-gauge studs. Regular board in a fire-rated assembly. Wrong material means rework — and rework means lost days on your schedule.
Framing positions, head heights, special assemblies — if the drywall sub isn't reviewing drawings before they show up, you're correcting their work in the field. That's expensive and delays the finish crew.
Framing done, but no RFI response on the board spec. Board is up, but the ceiling grid dimensions are wrong. These gaps between scopes cost days when nobody owns the coordination.
You've scheduled finish trade behind the drywall. The drywall sub ghosts. Now your finish crew is sitting, and the owner walkthrough is at risk. That's not a conversation you want to have.
25-gauge and 20-gauge load-bearing and non-load-bearing partitions. Axial and cross-副总 layouts. We frame to spec with correct track, stud spacing, and blocking — ready for board.
5/8" Type X and Type C board per spec. Full drywall scope: hanging, taping, mudding, and finish-ready for texture or flat paint. Fire-rated and sound-rated assemblies. Finish crew goes straight to work — no chasing our defects.
Type X and Type C assemblies for shaft walls, corridor ceilings, and rated partitions. Correct type, correct gauge, correct number of layers — the inspector checks this, not you.
Exposed grid, concealed grid, and soffit work. We handle the grid that sits above the board plane and coordinate with MEP so penetrations don't cut structural elements.
We review your model and drawings before mobilizing. Conflicting dimensions, penetration locations, and structural backing get flagged early — before the crew is on site and the clock is running.
Track, hang, tape, mud. Fast cycle from framing complete to ready-for-texture. We don't block finish trades — we hand off on schedule so the next phase starts on time.
The drywall tape and mud Phoenix phase is where commercial schedules live or die. Rushed seams show up under finish paint, missing corner bead gets called out at the walkthrough, and a Level 4 spec delivered at Level 3 quality pushes the finish trade back a week. We run the tape and mud phase the way it should be run on a Phoenix commercial job — embedded tape, three-coat mud work, square corners, and a finish that holds up to the spec.
Per spec: paper tape embedded in setting-type compound, three-coat mud work on flats, and square inside corners. Drywall tape and mud Phoenix crews finish to the level the painter or texture crew expects — Level 4 standard, Level 5 where the spec calls for it.
A drywall finisher Phoenix crews trust shows up when the board is up and stays until the finish is ready for texture or paint. We schedule the tape and mud phase against your overall schedule so the next trade walks in without delay.
For multi-family or TI scopes that need existing walls integrated after a repair, drywall texture matching Phoenix matches the room so the patch disappears. Orange peel, knockdown, skip trowel — matched to the surrounding profile.
More on our Phoenix drywall scope: drywall tape and mud Phoenix → · drywall texture matching Phoenix →
Commercial builds run on tight schedules. We're not a punch-list sub — we're a phase partner. That means we show up ready, read the drawings, and work to your timeline, not ours. 2 weeks from board-up to ready-for-texture is the target, and we build to hit it.
Standard TI partition work: board up in days 1–3, tape and mud days 3–7, ready for texture day 10–14. That schedule holds unless the scope changes.
Properly set beads, clean seams, flat mud work. We don't leave defects for the finish crew to chase — your painter and trim tech go straight to work.
We pull the partition plan, check stud gauge and spacing, note fire-rated assemblies, flag dimension conflicts. Questions answered before the crew arrives.
We track your overall schedule. If we need to compress or shift, we work with you — not against you. Finish trades don't sit because drywall ran long.
Tell us about the project — office, retail, industrial, spec home division. We'll review the scope and drawings, give you a timeline and a price before mobilizing.
Request a QuoteOr call directly — 623-265-3852
We read the partition plan and elevation drawings before mobilization. Dimensions, fire-rated assemblies, head heights, and special conditions — all confirmed before we show up on site.
Questions on board type, gauge, attachment, or assembly details — we respond to RFIs directly so you don't have to chase a sub who's hard to reach. One point of contact, fast answers.
We work from your construction schedule, not ours. If the phase shifts, we adapt. Finish crew behind drywall? We'll compress the mud phase. MEP penetrations delayed? We adjust our start. We coordinate, not just complete.
Commercial GCs running office, retail, and industrial TI work in Phoenix metro. You need a drywall sub who shows up when scheduled, reads drawings, and doesn't make the finish crew wait. Once the board is up, we hand off to tenant turnover and property management accounts who need the wall repairs to disappear before the next occupant moves in.
Developer-led spec homes and commercial shell builds. Active divisions with tight finish schedules. We handle the phase so you stay on the listing date — not behind it because drywall ran over.
RE firms managing office and retail acquisitions that need TI scope fast-tracked. We coordinate with your project manager on schedule and deliverables — one invoice, one point of contact.
Board-up to texture-ready in 14 days — standard TI partitions. Finish trades don't wait on us.
We read partition plans and elevation drawings before mobilizing — no dimension surprises on site.
Owner-operated. No subcontractors. Fully insured. One call to Catherine gets you a schedule, not a voicemail.
"We run tight schedules on spec builds — can't afford to have drywall blocking the finish crew. Supr5tr shows up ready, reads the drawings, and hands off on time. That's the whole ballgame for us."Jason K. · GC · Phoenix
"Catherine coordinated directly with our PM on the TI scope. RFI responses were fast, schedule stayed on track, and the finish crew went straight to work when we handed off. Exactly what we needed."Marcus T. · Project Manager · Scottsdale
See the work — Phoenix project portfolio →
Send us the drawings and the timeline. We'll review the scope, confirm the schedule, and mobilize ready to hit your target date.
When you reach out, send the partition plan and scope — we'll confirm schedule and pricing fast.
Actual Supr5tr crew on actual job sites. No stock photos, no AI generation.
Drywall dust, paint splatter, debris — gone. Supr5tr crews leave every space spotless and ready for walk-through.
During Construction
Island, pendant lights, plastic sheeting — every surface buried under drywall dust and debris before cleanup crew arrives.
Post-Construction Cleaning →
Same Space · After Supr5tr
Recessed lights, ceiling, and fixtures polished and dust-free. Ready for final walk-through — no punch-list, no callbacks.
Drywall + Punch-List →Tell us about the job. Catherine responds within one business day — no spam, no upsell.